Control airflow install at least 1 in.
Vented vs non vented roof.
Control of ice dams moisture accumulation and heat gain can be successfully addressed by both vented and unvented attic or roof design.
Joseph lstiburek from building science corporation.
Basically the term cold roof refers to a traditional roof or vented roof while hot roof refers to a roof that is not ventilated and which has foam insulation attached directly to the roof sheathing.
Some roof structures do not require the air to flow from the soffits.
Minimum 1 4 in.
In this case you can learn a lot from foam tech s article vented vs.
There are traditionally four main reasons for venting a roof.
It has the ability to work with vaulted ceilings and you only need one of them to get the job done for ventilation as compared to multiple box vents.
There are important layers between the soffit and your attic.
Both vented and unvented attic roof designs can be used in all hygro thermal regions.
25 mm of ccspf against the underside of the roof deck to prevent air leakage through the roof assembly and to prevent moist indoor.
Moisture content in roof structure must be less than 18 prior to covering.
Because the drying capacity of unvented roof assemblies is inherently lower than vented ones it is especially critical to control built in moisture during construction.
Additionally during high wind events vented soffit collapse leads to building pressurization and window blowout and roof loss due to increased uplift.
One may ask that given the value of the air flow in the attic why would anyone choose non vented.
Controlling ice damming by keeping the roof cold.
You ll find insulation and a.
Enhancing roofing material life span by reducing sheathing temperature.
Unvented roofs vented roof.
The choice of the venting approach is up to the designer.
If wood shingles or shakes are used a layer of drainage mat e g.
However the designs need to be climate sensitive.
Removing moisture from roof cavities structural members sheathing and insulation.
It is the more expensive vs.
Or 6 mm vented airspace should be installed between the roofing and the underlayment.
Control construction moisture content with tenting or temporary roofing when necessary.
A box roof vent but it s still non mechanical so you will not need to spend money on electrical issues or failures in the system.
Learn the difference between vented soffit and non vented soffit.