The verge edge on the gable end of my roof is deteriorating where the cement pointing is falling out.
Verge end roof decorations.
It hangs from the projecting end of a gable roof.
Use a cold chisel and club hammer to get rid of worn out and damaged mortar.
The verge begins where the outer shingles or roofing tiles end and the roof meets the gable which is the ridge formed by the 2 sides of the roof.
Originally this victorian wood trim also called vergeboard or verge board verge being the end or edge of a thing was used to hide the ends of rafters.
Also keep in mind that if a dormer has a 12 12 pitch a single bracket can be used for decoration.
The asbestos type tiles beneath are breaking and falling along with the cement its supporting.
The 12 12 roof pitch is also known as a square pitch roof since a 90 degree angle is formed at the peak of such roofs.
Use a stiff brush and wipe away debris particles and dirt from the surface.
Kytun tile dry verge system aluminium 50mm pallet of 58 from.
Step 2 clean roof verge.
Shop from our extensive range of dry verge roofing systems which provides a quick and easy way to securely fix roof tiles without the need for mortar.
35 88 ex vat 43 06 inc vat.
Dry verge roofing makes use of interlocking caps that fit over the edge of your roof tiles and offers an effective and more importantly durable alternative to wet verges.
This should make it possible to work easily on the roof verge.
A dry verge is a roofing system that uses interlocking pieces to cover the verge rather than the traditional mortar.
They may be mounted flash on the end wall or stood off on an overhanging framework with a soffit underneath.
Barge boards decorative boards mounted under the roofing at a gable end traditionally timber nowadays usually upvc.
Therefore i ve seeked two quotes to repair this and the best way ahead is to remove all the pointing and replace with nice looking dry verge covers.
This works well because this is a two window dormer.
Roof verge tiles can be used to good effect as cost efficient feature that will finish the roof flush with gable walls.
Our smaller old lace gable decorations fit most single window dormers.
Hambleside danelaw hdidvhr half round ridge end cap dry verge kit pack of 10 from.